Construction and real estate

Tendering, site supervision and valuation: where AI holds in construction and why assessing access to housing touches a legal limit.

·2 min read·By Redaktion KI-Kompass
DETAIL
4 sections

What this is about

TaskClassification
Drafting a specificationunproblematic, with review
Comparing bids and finding deviationslimited
Documenting progress from photosunproblematic
Recording and assigning defectsunproblematic
Comparing measurements against the planunproblematic
Forecasting duration and costlimited
Assessing prospective tenantshigh, essential service

The tasks that hold

  1. 01

    Analyse photo documentation

    Progress per trade from images, with date and location. It replaces no handover, but it makes the sequence evidenced.

  2. 02

    Record defects

    Image, location, trade, a proposed assignment. A person checks the assignment, because money hangs on it.

  3. 03

    Compare bids

    Line items side by side, finding deviations and missing items. The most common finding is the item one bid leaves out.

  4. 04

    Plan comparison

    Measurements against the plan, deviations marked. See Segmentation.

Procurement

  • In public procurement the evaluation must be reasoned traceably. A model output is not a reason.
  • A tool may produce pointers; the contracting authority makes and documents the evaluation.
  • Bid documents are confidential. The processing location is settled beforehand, not afterwards.
  • Variation claims are where an unclear specification takes revenge. Check drafts there with particular care.

Where the line runs

Annex III lists systems that decide on access to essential private and public services. Housing is treated in practice as such an area where a selection is made among applicants.

  • Pre-sorting by creditworthiness, origin or family status is not defensible without an examined basis and is open to discrimination claims.
  • Indirect selection through characteristics correlated with protected ones is caught as well.
  • Wherever a selection happens, the reasoning belongs to the task and must be traceable without the system.

Site supervision and employees

Cameras on site capture workers, even where they are meant to document the build.

PurposeAdmissibilityCondition
Documenting progressgenerally soundAnalyse footage without personal reference
Detecting safety violationsnarrowly boundedCouncil involvement, no personal analysis
Recording attendanceits own purposeExamine the legal basis separately
Assessing individual performancenot defensiblenone

What belongs in the documentation

  • Which images were analysed, with the period and the purpose.
  • Which defect assignment came from the system and who confirmed it.
  • Which version of a specification was produced with which tool.
  • In procurement: the evaluation reasoning, independent of the model output.

Entry sheet: construction and real estate

FREE ACCOUNT

Entry sheet for construction and real estate

This sector's tasks by risk class, the points to settle beforehand, and the metrics the benefit shows up in.

Checklist3 items

No password needed. We send you a sign-in link. An account does not subscribe you to anything. The newsletter is separate.

Was this page helpful?
Construction and real estate