Status reports, minutes, risks and dependencies: where AI saves time in project work and why it does not replace an estimate.

·2 min read·By Redaktion KI-Kompass
DETAIL
4 sections

What this is about

TaskValue
Assembling a status report from ticket system and notesvery high
Producing minutes and extracting actionshigh
Collecting risks from minutes and reportshigh
Checking requirements for contradictionsmedium
Finding dependencies between work packagesmedium
Estimating effortlow without your own history

Introduction

  1. 01

    Start with the status report

    It is weekly, follows a fixed structure and draws on sources that already exist.

  2. 02

    Fix the structure

    A report with a fixed structure can be checked. A freely written one cannot.

  3. 03

    Name the sources

    Every statement in the report with its origin: which ticket, which minutes, which date.

  4. 04

    Minutes only afterwards

    They need a settled legal basis and the agreement of those present.

  • Do not take figures from the model; figures come from the system.
  • Names in minutes only with a clear rule about how people are referred to.
  • Always confirm actions from minutes before creating them.
  • Have a named person own the report at the end.

Estimating with your own history

A defensible estimate needs three things: comparable completed items, the actual effort for them, and an honest statement of spread.

  • At least 30 comparable completed work packages, otherwise the spread cannot be estimated.
  • Always give a range, not a point value. A median plus an 80th percentile is usable; a mean alone is not.
  • Handling times are right-skewed. Planning on the mean plans above the typical case and below the bad one.
  • Hold the estimate against the actual course and track the deviation. Without that feedback the estimate never improves.

Transcribing meetings

PointRequirement
InformationEveryone present before the start, not after
Legal basisLegitimate interest or a works agreement; consent in employment is vulnerable
Co-determinationRoutinely engaged, since the facility is capable of conduct monitoring
RetentionRecording far shorter than the minutes; set both separately
ObjectionA way to take part without being recorded must exist

See Speech recognition and GDPR and AI.

Metrics

QuantityBaseline
Time per status reportcollect over six weeks
Share of reports going out without reworkcontinuously
Time from meeting to circulated minutesbefore and after
Share of actions correctly created from minutessample

Choosing a task in project management

FREE ACCOUNT

Selection sheet and templates: project management

A sheet that picks the first task out of the ones project management actually has, with two tested templates and the review steps for them.